Undeveloped Area Towards the Border
A single area of approximately 28,000 sq. m near Road 87, off the border, immediately next to the bicycle path under construction.
Download the introductory data sheet
PDF format, printable


Location




Data



Name of the Area
Undeveloped area in Rőti-völgy (Rőti valley)
Lot Number
06/9
Classification
Arable land
Location in the Settlement Structure
Outside municipality boundaries
Classification in the Land Use Plan
K-Sz/2 | Land Use Plan
Original / Old Function of the Area
Unutilised Area
Size of the Area
11,909 sq. m
Accessibility
From Primary Road 87
Ownership
1/1 by the Municipality of Kőszeg
Contact Details
Kőszeg Város Önkormányzata, Városüzemeltetési osztály (The Municipality of Kőszeg, Urban Management Office)
+36 94 562 517
+36 94 562 529
Name of the Area
Undeveloped area in Rőti-völgy (Rőti valley) II.
Lot Number
06/10
Classification
Arable land
Location in the Settlement Structure
Outside municipality boundaries
Classification in the Land Use Plan
K-Sz/2 | Land Use Plan
Original / Old Function of the Area
Unutilised Area
Size of the Area
11,979 sq. m
Accessibility
From Primary Road 87
Ownership
1/1 by the Municipality of Kőszeg
Contact Details
Kőszeg Város Önkormányzata, Városüzemeltetési osztály (The Municipality of Kőszeg, Urban Management Office)
+36 94 562 517
+36 94 562 529
Name of the Area
Undeveloped area in Rőti-völgy (Rőti valley) III.
Lot Number
02/1
Classification
Pasture
Location in the Settlement Structure
Outside municipality boundaries
Classification in the Land Use Plan
K-Sz/2 | Land Use Plan
Original / Old Function of the Area
Unutilised Area
Size of the Area
4,138 sq. m
Accessibility
From Primary Road 87
Ownership
1/1 by the Municipality of Kőszeg
Contact Details
Kőszeg Város Önkormányzata, Városüzemeltetési osztály (The Municipality of Kőszeg, Urban Management Office)
+36 94 562 517
+36 94 562 529
Megjegyzés
A single area of approximately 28,000 sq. m near Road 87, off the border, immediately next to the bicycle path under construction.
Public Utilities (Capacity)
Water: The pipeline runs within the plot boundaries
Wastewater: The nearest possible point of connection is approx. 1200 meters away, in Kéthelyi Street.
Electricity: Connecting electricity from the direction of Nemezgyári út or the border crossing is not possible. Connection can be ensured by a 20kV branch off the network (after submitting the request to the electricity provider). The project has to be planned and construction has to be completed with a lead time of approx. 2 years; and it also has associated cost.


Photos





Contact Details



Kőszeg Város Önkormányzata, Városüzemeltetési osztály (The Municipality of Kőszeg, Urban Management Office)